Month: August 2017


  • Drywall, texture, and paint

    After the siding was finished, the gutters and gas meter were installed before painting.  At this point, all exterior painting is complete pending some touch-up work.   On the interior, all drywall work is complete with texture and first coat of paint on.  After next steps (cabinets and flooring), we’ll have another coat of paint…